Layout and relocation optimization of double crushing station in inclined coal seam open-pit coal mine
XU Quanyao
CAI Mingxiang
GAO Jinlong
CAO Bo
LIU Shichen
WEN Yu
Keywords:open-pit coal minelongitudinal mining end slope crushing stationcost equalization methodrelocation intervalrelocation plan
Publication Date:2023-07-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 28-33 )
Coal Engineering

Coal Engineering

ISTICPKU
ISSN:1671-0959
Year, Vol.(Issue):2023,55(7)