DOI: 10.11799/ce202302015
Advance control of water hazard through limestone nappe in deep roadway group in coal mine
XING Maolin
Machine-generated Keywords:
Publication Date:2023-02-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 81-85 )
