DOI: 10.11799/ce202208003
Design on reconstruction scheme of local secondary roof ripping to overpass the belt haulage roadway
LIU Guang-jin
YANG Wei
YUAN Zhi-gang
LI Jin-liang
ZHANG Ji
Machine-generated Keywords:
Publication Date:2022-08-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 12-16 )
