Roof structure stability of fully mechanized caving face passing through coal pillar in short distance coal mining under gully landform
SHI Hua-jun
Machine-generated Keywords:
Publication Date:2022-06-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 64-69 )
Coal Engineering

Coal Engineering

ISTICPKU
ISSN:1671-0959
Year, Vol.(Issue):2022,54(6)