DOI: 10.11799/ce202206012
High water filling technology for fully mechanized top-coal caving face crossing close-set abandoned roadway groups
SHAO Chun-rui
LI Jun-qing
ZHAO Bao-you
Machine-generated Keywords:
Publication Date:2022-06-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 57-63 )
