Numerical simulation on upward mining above pillar mining goaf
ZHANG Xiao-jun
QIN Xiang-rui
CHEN Xun-xun
ZHANG Jia-fan
Machine-generated Keywords:
Publication Date:2022-03-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 6-11 )
Coal Engineering

Coal Engineering

ISTICPKU
ISSN:1671-0959
Year, Vol.(Issue):2022,54(3)