DOI: 10.11799/ce202201003
Optimization design countermeasures of resume construction in Xizhuo Coal Mine
YANG Yan-hong
Machine-generated Keywords:
Publication Date:2022-01-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 18-23 )
