DOI: 10.11799/ce202111044
Engineering quality control for super-high cutting fully mechanized mining face in Shangwan Coal Mine
CUI Shi-lei
ZHANG Yuan
Machine-generated Keywords:
Publication Date:2021-10-31
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 36-40 )
