DOI: 10.11799/ce202111038
Steep end-slope mining scheme of open-pit mine based on RMR engineering rock mass evaluation
JIAO Xiao-liang
WANG Zhi-le
KONG Rui-qian
WANG Xiao-yu
Machine-generated Keywords:
Publication Date:2021-10-31
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 6-12 )
