DOI: 10.11799/ce202111037
Theoretical deduction and method comparison of ramp construction in Haerwusu Open Pit Coal Mine
ZHANG Peng-jiao
Machine-generated Keywords:
Publication Date:2021-10-31
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 1-5 )
