DOI: 10.11799/ce202112008
Narrow coal pillar width and surrounding rock control of gob-side entry driving in 6m high-cutting working face
TIAN Chun-yang
CHANG Yun-bo
ZHU Tao
ZHENG Li-yong
JIANG Guang
XING Xu-dong
Machine-generated Keywords:
Publication Date:2021-12-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 39-44 )
