DOI: 10.11799/ce202111013
Key technologies for drilling and completion of No.15 coal L-shaped horizontal well in Zhengzhuang block, Qinshui Basin
ZHANG Qiang
Machine-generated Keywords:
Publication Date:2021-11-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 61-66 )
