Design scheme for main adit of Wenjiaba No. 1 Mine crossing an extra-large karst cave
CHEN Ming
TIAN Ming-fu
Machine-generated Keywords:
Publication Date:2020-07-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 32-36 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2020,52(7)