DOI: 10.11799/ce2019S0044
Design Optimization and Construction Scheme of Horizontal Extension in Shaping Coal Mine
LIU Xue-wen
Machine-generated Keywords:
Publication Date:2019-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 10-14 )
