High Prestress Intensive Support Technology for Gob-side Fully Mechanized Top-coal Caving Roadway Disturbed by Repeated Excavation and Mining
ZHONG Jian-ping
FENG You-liang
HE Jie
Machine-generated Keywords:
Publication Date:2019-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 66-71 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2019,51(12)