DOI: 10.11799/ce201912010
Study on Designed Parameters Calculation Method of Borehole Drilling for Gas Pressure in Inclined Coal Seam
MA Wen-wei
Machine-generated Keywords:
Publication Date:2019-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 48-52 )
