DOI: 10.11799/ce201903002
Optimization Design of the Development Plan of Hami No. 1 Mine based on Overall Comparison Method
LIU Liang
Machine-generated Keywords:
Publication Date:2019-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 5-8 )
