DOI: 10.11799/ce201812008
Centralized control design of main manufacturing system for Panji Coal Preparation Plant
ZHU Zai-sheng
ZHU Jin-bo
WANG Shui-qing
LIU Yin
GUI Yang-yang
LI Yong
SUN Hang-hang
Machine-generated Keywords:
Publication Date:2018-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 28-31 )
