DOI: 10.11799/ce201811002
Water drainage design of working face floor centralized drainage roadway in Gaojiabao Coal Mine
SHENG Chao
Machine-generated Keywords:
Publication Date:2018-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 6-9 )
