Research on gob-side retaining and shearer cutting tunnel mining system in Nanliang Coal Mine
ZHENG Zhong-you
YANG Xiao-ke
ZHU Lei
LI Xue-qiang
HUA Zhao-wen
Machine-generated Keywords:
Publication Date:2018-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 1-6 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2018,50(8)