DOI: 10.11799/ce201804005
Discussion on 3D geological modeling based on MicroStation platform
WU Xiao-gang
Abstract:MDL secondary development method was applied based on MicroStation software development platform, combining with the specific complexity of coal mine geological conditions, with the establishment of topography and graphics library, drilling database, structure database, etc., through linking relative database spatial interpolation was implemented to generate hook surface of each coal rock marker bed, and finally the 3D geological model was established. Using the data and graphics processing functions, the paper started from the research on process and key points of coal mine 3D geological modeling, to explore a set of concept suitable for 3D geological modeling, and demonstrated the effect of 3D geological modeling and visualization.
Keywords:MicroStation3D geological modelingdatabasecoal rock marker beddigital mine
Publication Date:2018-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 16-18 )
