Optimization and transportation of Baorixile Open-pit Mine development and transportation system
ZHANG Run-ting
Abstract:In order to reduce the cost of the pit line transportation systems in Shenhua Baorixile Open-pit Coal Mine, a transportation system is put forward through demonstration, which combines middle bridge with internal dump site. The location and parameters of the middle bridge are optimized based on the secondary stripping amount of the middle bridge and lagging space of the inner dump site. Application practice shows that the proposed transportation system effectively reduces the distance, and increases the economic and safety benefits significantly.
Keywords:open-pit minecoal mine developmenttransportation systemmiddle bridgeinner dump site
Publication Date:2018-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 27-29 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2018,50(3)