DOI: 10.11799/ce201801020
Application of PLC control system in semi-dry flue gas desulfurization project
ZHANG Han
Abstract:Aiming at the production problems caused by high failure rate,frequent operation and other reasons in conventional instruments control system of semi-dry high-rate gray-calcium cycle integrated desulfurization dust control system,in this paper,the author introduces the application of PLC control system in the semi-dry flue gas desulphurization project of Shentu No.2 Mine of Shendong Company;summarizes the technological principle of semi-dry flue gas desulphurization,introduces PLC control system selection in detail,PLC system configuration and power and grounding reliability design.Combined with the characteristics and control requirements of the semi-dry flue gas desulfurization project,the control system is divided into three parts:data acquisition and processing,analog automatic adjustment and switch order control according to the functions;and discusses the controlled objects and control principal in each part in detaiL In the analog automatic adjustment PID control is introduced to achieve closed-loop control.
Keywords:PLC control systemsemi-dry flue gas desulfurizationPID control
Publication Date:2018-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 69-72 )