DOI: 10.11799/ce201801014
Research on integrated connection survey method
LIU Shao-chun
Abstract:The author put forward the integrated connection survey method using electronic total station,optical plumb,and gyrotheodolite to replace the traditional surveying method using both plane connection survey and elevation connection survey,which solves the problem of low efficiency and long-time operation in shaft of traditional survey method.It is convenient and accurate to project the points by optical plumb,to lead in the altitude from the top of total station,and to get gyro orientation in advance,or to lay the gyrotheodolite at the back sight point to conduct the connect surveying in parallel in the bottom.Combined with the practical working experience,the author analyzed the key points during operation and the matters need attention.It offered a technical guarantee for effective operation of integrative connection survey.
Keywords:intergrated connection surveytotal stationoptical plumbgyrotheodolite
Publication Date:2018-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 48-51 )
