DOI: 10.11799/ce201711002
Combined mining scheme design for coal-aluminum symbiotic resources
YANG Yan-hong
Abstract:Based on the analysis of geological conditions and the status quo of bauxite development system in the coal aluminum symbiotic mine,combined with the complex terrain conditions of loess hills,the feasibility of wellhead position and industrial site location plan was demonstrated,then the technical and economic comparison analysis was implemented for hoisting scheme of main shaft auxiliary shaft,arrangement scheme of the ventilating shaft and the underground development tunnels of the coal aluminum united mining.Finally,the coal aluminum symbiotic resources combined development layout was determined.
Keywords:coal aluminum combined miningbelt conveyorhoisting waywellhead positiondevelopment tunnels
Publication Date:2017-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 6-9 )
