Study on roadway layout and critical thickness of interlayer in close distance coal seams mining
TIAN Ke
SONG Zi-yu
SU Ze-hua
QI You-zhao
WANG Shu-shuai
WANG Zhi-qiang
ZHAO Jing-li
Abstract:In order to ensure the safety, economy and high recovery rate in the mining of 8# and 9# coal seams of Guandi Coal Mine, which are close and ultra-close coal seams, we applied theoretical calculation and mechanical model to study the roadway arrangement. According to the study a three -purpose mining roadway was arranged in the floor of 8 # coal seam. Based on the arrangement, the critical thickness of the two interlayers was calculated, which were of proper conditions for joint exploitation. The mining method was also determined, in which stager arrangement was used for the full-height mining in first mining working face.
Keywords:ultra-closeroadway layoutinterlayerjoint exploitationcritical thickness
Publication Date:2017-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 27-30,35 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2017,49(9)