DOI: 10.11799/ce201702019
Time-dependent behavior of bolt anchoring and its recovery technology in sidewall anchor along mining roadway
LI Liang
HUANG Ke-jun
LIU Wen-jing
ZHANG Yuan-zhen
QIAO Yi-lin
Abstract:To eliminate the security risks from metal bolt-rod legacy in front of the long-wall working face, on the basis of time-dependent behavior of bolt anchoring and stability criterion of surrounding rock and numerical calculation, the reasonable recovery range was optimized for the bolt in front of long-wall working face and a recovery equipment of bolt was developed using combined hollow auger drill as main body. A complete set of recovery technical measures in front of the long-wall working face was established. According to filed test, the recovery schemes were feasible and practical.
Keywords:mining roadwaybolttime-dependent behavior of bolt anchoringbolt rod recoveryrecovery equipment
Publication Date:2017-01-01
Pages:3( 59-61 )
