DOI: 10.11799/ce201701006
Closed renovation engineering design for load-store-transport system of Honghe freight station
YAO jia-yin
Abstract:In order to improve the working efficiency, alleviate the coal dust pollution to surrounding environment, and to solve the problems in open coal stacking and loading machine, closed coal storage yard and rapid loading system were designed for Honghe freight station. Closed-renovation engineering design was done for the production process, tunnel support, reinforced earth retaining wall, ventilation dust removal and fire control. After renovation, the coal production cost, transportation loss and pollution were reduced, while improving the loading efficiency and freight station capacity. The design could offer references to the other similar projects, such as transformation of traditional coal freight station to high-efficiency and environment-friendly modern coal logistics hub.
Keywords:freight stationload-store-transport systemclosed coal storage yardrapid loading systemclosed renovation engineering
Publication Date:2017-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 18-20 )
