Grouting treatment for water inrush under complex structure in Xin′an Coal Mine
WANG Guang-qiang
YANG Heng
XIAO Luo-kun
XU Zuo-rong
XIAO Xiong
DENG Chao-yi
MING Wen-cheng
Abstract:In order to ensure the mining safety of 112121 working face in Xin'an Coal Mine, sectional target grouting technology was applied to reform the water-rich aquifer of working face floor, and reinforce the incomplete aquiclude. According to the grouting area situation and water inflow of the seam, the sub-region and sectional grouting was carried out to eliminate potential hazard in the working face, using clay cement slurry and cement-water slurry as grouting material. Practice has proved effectiveness of the grouting technology.
Keywords:sectional groutingaquifergrouting reinforcementpotential water hazardgrouting material
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 34-36 )

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2016,48(z1)