DOI: 10.11799/ce201608019
Research on withdrawing and installation of coal mining equipment in fully mechanized top coal caving face with large mining height
TIAN Hua
Keywords:large mining heightfully mechanized top coal caving facemechanized installationwithdrawing processhydraulic support
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 61-63,67 )
