DOI: 10.11799/ce201605019
Design and construction of large height section pre-grouting for water prevention and control in bedrock segment of Shunhe mine main shaft
XIE San-jian
LIU Xing-yan
ZHAO Yan-qing
ZHAO Feng-jin
Keywords:bedrock sectionlarge section heightworking face pre-groutinggrouting ground station
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 59-61 )
