Design optimization for construction scheme of product silo roof structure in Zhuji west coal mine coal preparation plant
ZHANG Hua-quan
XIONG Hui
PENG Lu-ping
Abstract:Aiming at the long period, great difficulty, high cost and multi potential safety hazard in the construction of product silo in Zhuji west coal mine coal preparation plant, the construction scheme design is optimized combining with the silo roof structure features, to cut the construction period, reduce construction cost, under the premise of construction safety. This cable-stayed steel wire rope hanging synovial operating steel platform is applied as a support warehouse top construction steel structure platform construction scheme, the construction difficulty is solved, achieving the engineering requirements.
Keywords:product silo of coal preparation plantsilo roof structureconstruction schemeslip-form constructioncable-stayed steel wire rope
Publication Date:2016-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 27-28,32 )

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2016,48(3)