Divisional slip-form construction technology for silo group project
WANG Ben-meng
Abstract:To realize divisional construction of silos group, and shorten construction period, the paper took the construction practice in a coal preparation plant as engineering background, studied the divisional slip form construction technology, through the improvement of hydraulic slip form system, the slid form operation platform was transformed into suspension platform, besides the support rod, boom, slide rail and a pulley and other technical measures were applied to ensure the smooth construction of divisional slip-form technology. The practical results show that, the construction period is significantly shortened, achieving expected effect.
Keywords:coal preparation plantsilo groupsliding modehydraulic slip-form systemsuspension platform