Design and Construction of Main Shaft Skip Loading Chamber in Baodian Coal Mine
YU Wei-qin
CHEN Zhao-xuan
Keywords:skip chamber constructionsecondary supportmine designBaodian Coal Mine
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 9-10,14 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2015,47(7)