Pre-Grouting Crossing Aquifer Technology in West Air Return Shaft of Shiyakou Coal Mine
LI Si-biao
YANG Ru-jun
GAO Jin-shan
Keywords:air return shaftwater inflowpre-groutingcrossing aquiferwater control
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 53-54,57 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2015,47(6)