DOI: 10.11799/ce201506003
Narrow Coal Pillar Width Determination of Large Section Gob-Side Entry Driving in Fully Mechanized Top Coal Caving Face
JI Chun-xu
YANG Yong-kang
FENG Guo-rui
Keywords:large sectiongob-side entry drivingnarrow coal pillar widthnumerical simulation
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 7-10 )
