DOI: 10.11799/ce201503014
Key Technology of Vertical Shaft Construction Crossing Pingdingshan Sandstone Section
YAN Xin-ling
Keywords:Pingdingshan sandstonehard rockwater controlshaft construction speed
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 41-43 )
