Optimization of Stope Replacement Plan for Leftover Coal Mining
TANG Bin
Keywords:leftover coalstope replacementrecovery ratefeasibility analysisplan optimization
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 5-7 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2015,47(3)