DOI: 10.11799/ce201503002
Optimization of Stope Replacement Plan for Leftover Coal Mining
TANG Bin
Keywords:leftover coalstope replacementrecovery ratefeasibility analysisplan optimization
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 5-7 )
