DOI: 10.11799/ce201502017
Study on Operation Rate of 8101 High Cutting Fully Mechanized Mining Face in Wangzhuang Coal Mine
SONG Gao-feng
Kong De-zhong
Du Qiu-hao
LIU Dong-dong
Keywords:high cuttingfully mechanized mininghigh yield and high efficiencyoperation rateimprovement measures
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 53-55 )
