DOI: 10.11799/ce201501014
Rapid Installation Technology of Fully Mechanized Mining Equipment in Steeply Inclined Longwall Face Along Strike
FU Ming-hua
LIANG Li-xun
ZHANG Ning-zhao
ZHUO Jun
YU Yang
CHENG Chang-yong
Keywords:steeply inclined coal seamlongwall along strikefully mechanized equipmentrapid installation
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 44-46 )
