DOI: 10.11799/ce201411011
Study on Mold Bag Construction Technology of Airtight Wall Rapid Shaping in Backfilling Stope Roadway
TIAN Jin-zhou
Keywords:stope roadwayairtight wallrapid shapingmold bagconstruction process
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 33-35 )
