DOI: 10.11799/ce201408019
Analysis on Stability of Run-Through Flow in No.11101 Floor Gas Drainage Gateway of Liangbei Mine
CHENG Lei
ZHENG Xiao-peng
WANG Dong-dong
Keywords:resistance measurementnetwork calculationventilator capacityinstallation anglestability
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 58-60 )
