Cause Analysis and Treatment Measures of Common Faults Occurred in Pilot Hole Drilling of Raise Boring Machine
SUN Jian-rong
Keywords:raise boring machinepilot holeborehole shrinkagehole wall collapsingdrilling stickingdeviation rate
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 45-47 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2014,46(8)