DOI: 10.11799/ce201408002
Optimized Design on General Construction Plan of Yuanzigou Mine
YANG Huai-min
TENG Xin-lin
WEI Gao-wei
Keywords:mine constructionhoistingequipment of mine shaftgeneral constructionplan optimization
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 5-7,11 )
