Analysis on Economic Operation Features of Mine Shaft Hoisting System
ZHU Jian
LI Yu-jin
ZHANG Bao-lian
Keywords:hoisting speedDC or frequency convertedelectric consumption per t of coalunbalanced hoistingeconomic operation
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 22-23,26 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2014,46(7)