Design Optimization on Site Selection and Layout Arrangement of Gas Power Generation Project in Tunlan Coal Mine
ZHANG Hua-quan
GUO Hong-wei
YIN Guo-zhu
Keywords:gas power stationgas storage and distribution stationretaining wallwaste heat utilizationsite selection
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 5-7 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2014,46(4)