DOI: 10.11799/ce201402019
Study on Pre-Cracking Technology of Mine Roof in Fully Mechanized Top Coal Caving Mining Face
ZHENG Wen-xiang
Keywords:fully mechanized coal mining facepre-cracking of mine roofweakening treatmentfalling distance
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 55-57 )
