Rapid Installation Technology of Fully Mechanized Inclined Mining Face with High Inclination and High Cutting
ZHU Ruo-jun
LI Zhi-hua
YANG Ke
Keywords:large mining heightlarge dip angleinclined longwall mining facequick installationendless rope hoist
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 46-48 )
Coal Engineering

Coal Engineering

PKUISTIC
ISSN:1671-0959
Year, Vol.(Issue):2014,46(2)