DOI: 10.11799/ce201401007
Adjustment on Line Pole Location of 110kV Power Line Route in East Ventilation Shaft Mine of Songshan No.1 Mine
ZHANG Ya-ke
ZHANG Guo-Jun
Keywords:overhead power line routesubsidence zoneline pole location adjustment
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 22-23,26 )
