DOI: 10.11799/ce201312015
Optimization of Blasting Parameter Design for Mine Hard Rock Roadway Heading
PING Qi
LIU Yan-jun
ZHOU Lu-jun
WANG Feng
WANG Zhi-yong
Keywords:Wolonghu Minemine hard rock roadwayrapid headingheading blastingmedium depth borehole blasting
Publication Date:2013-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 39-41 )
